The three phases
Post-construction cleaning is not one visit. Treating it as one visit is why final cleans get redone at the client's expense.
- Rough clean: after framing and drywall, before finishes. Debris removal, sweeping, sticker and label removal, gross dust knockdown.
- Final clean: after trades are finished. Full detail of all surfaces, fixtures, glass, floors, and washrooms.
- Touch-up clean: immediately before handover or occupancy, after punch-list work has kicked up new dust and fingerprints.
Room-by-room checklist for the final clean
- Ceilings, ducts, sprinkler heads, and light fixtures high dusted top-down
- Walls wiped, paint overspray and adhesive removed from switches and outlets
- Windows cleaned inside and out, frames and tracks vacuumed, stickers removed
- Doors, frames, hardware, and kick plates detailed
- Cabinets and millwork cleaned inside, outside, and on top
- Washrooms fully detailed: fixtures, mirrors, partitions, grout haze removed
- Floors vacuumed then scrubbed or damp mopped, with protective finish applied where specified
- HVAC vents and returns wiped, filters flagged for replacement
What drives the price
| Factor | Effect on cost |
|---|---|
| Square footage | Base driver — most quotes start per square foot |
| Dust load and trade cleanliness | Poorly managed sites can double labour hours |
| Ceiling height | Lifts and fall protection add equipment and time |
| Glass quantity | Large curtain wall areas are labour intensive |
| Floor type | Polished concrete and stone need specialized handling |
| Schedule pressure | Overnight or weekend completion adds premium hours |
Common exclusions to confirm in writing
- Construction debris and bin removal — usually the general contractor's responsibility
- Paint or grout haze removal beyond normal effort
- Exterior site cleanup and power washing
- Duct cleaning by a certified HVAC contractor
- Removal of protective floor coverings and hoarding
Getting the timing right
Book the final clean only after the last dusty trade has left. If painters, drywall patchers, or flooring installers return after the final clean, you will pay for a second visit. The reliable sequence is: punch list identified, dusty work completed, final clean, then touch-up clean the day before occupancy.
For occupied buildings undergoing renovation, schedule cleaning nightly during the project rather than only at the end — dust migrating into working areas generates far more complaints than the construction noise does.
Frequently asked questions
How much does post-construction cleaning cost?
Most GTA projects are quoted per square foot, with the total driven by dust load, ceiling height, glass area, and how tight the handover schedule is. A site walkthrough gives a firm number.
How many cleans does a construction project need?
Three: a rough clean after drywall, a full final clean once trades are done, and a touch-up clean immediately before handover.
Does post-construction cleaning include debris removal?
Usually not. Construction debris and bins are typically the general contractor's responsibility; the cleaning scope starts once the site is cleared of bulk material.
How long does a final clean take?
It depends on area and finish level, but crews are sized to hit your handover date — overnight and weekend completion is normal on commercial projects.